For Engineering development, Gruminex counts on the experience and capacity for preparing effective and sustainable projects, continuously updating Equipment and application systems, as well as regulation standards applicable in the country.

Bi Metals de México S. de R.L. de C.V.

Start date: 2019

Navojoa
Sonora

Construction of Pumping Expansion in Piedras Verdes Unit

First Majestic Silver Corp

Start date: 2019

Banamichi
Sonora

Engineering development and supervision for the AG / SAG Conversion Santa Elena Unit project

First Majestic Silver Corp

Start date: 2018

.
Durango

Development of Construction Engineering for the Microcel Cell Circuit, in the La Parrilla Unit

Compañía Minera La Parreña

Start date: 2018

.
Sonora

Design of Drinking Water and Sewerage System for the Milpillas Unit Contractors Camp

Compañía Minera La Parreña

Start date: 2018

.
Sonora

Realization of Electrical Assessment of Installations and Electrical Project for improvement of facilities for Camp of Contractors in Milpillas Unit

Agnico Sonora S.A. de C.V.

Start date: 2018

.
Sonora

Supervision of Fire System Construction in Camp, Unidad La India.

Grupo México

Start date: 2018

Nacozari
Sonora

Development of Detail Engineering for Sludge Neutralization System and capital cost estimation.

Compañía Minera Sabinas

Start date: 2018

Sombrerete
Zacatecas

Development of Engineering for Water Conduction Line of Mpio de Sombrerete, Zac. To Mine Unit Sabinas

Agnico Sonora S.A. de C.V.

Start date: 2018

.
Sonora

Design of Fire System in Camp, Unit India.

Compañía Industrial Hanka S.A. de C.V.

Start date: 2018

Mesa del Seri
Sonora

Supervision of Civil Engineering, Structural, Mechanical, Pipes and PD & IS, for Expansion Project Beta.

Cliente Confidencial

Start date: 2017

Baja California
Baja California

We are currently working on the Development of the Aqueduct Executive Project and 100 km Geotechnical Studies with adjustments in 2 Wastewater Treatment Plants.

First Majestic

Start date: 2017

Chalchihuites
Zacatecas

We are currently developing the Engineering for modification of the primary crushing system, including conveyor adaptation, chutes design, concrete redesign and structure to support the new Quijada

Compañía Industrial Hanka

Start date: 2017

.
Sonora

We are working on its Beta plant, where it has been carried out, the engineering of the expansion of the System, including design of concrete, structures, pipes, mechanical equipment such as pumps,

Premier Gold Mines

Start date: 2017

Cucurpe
Sonora

The electrode measurement of the plant was carried out, and a technical measurement report was presented.

First Majestic Silver Corp

Start date: 2017

Banamichi
Sonora

Realization of Project of Control of Powders and Ventilation for Laboratory

Agnico Eagle

Start date: 2017

Unidad La India
Sonora

The replacement, supply and installation of doors, installation of emergency alarms, as requested by the STPS (Secretary of Labor and Social Welfare) was carried out

First Majestic Silver Corp

Start date: 2017

Banamichi
Sonora

Realization of Executive Project and Construction for Aerodrome of Santa Elena Unit

First Majestic Silver Corp

Start date: 2016
Date of completion: 2017

Durango
Durango

Realization of Project of Control System of Powders for laboratory

Compañía Industrial Hanka S.A. de C.V.

Start date: 2015
Date of completion: 2016

Mesa del Seri
Sonora

Construction Supervision of works Civil , Structural , Mechanical , Piping and Electrical , for confidential project .

Compañía Industrial Hanka S.A. de C.V.

Start date: 2015
Date of completion: 2016

Mesa del Seri
Sonora

Development of Civil Engineering, Structural , Mechanical, Piping and Electrical, for confidential project .

First Majestic Silver Corp

Start date: 2015
Date of completion: 2016

Banamichi
Sonora

Development of Pre - Design sedimentation basins for Mina Santa Elena

Nusantara de México S.A. de C.V.

Start date: 2015
Date of completion: 2015

Banamichi
Sonora

Development of General Arrangements Tailings conveyors Dry Strip for Mina Santa Elena

Nusantara de México S.A. de C.V.

Start date: 2014

Banamichi
Sonora

Collaboration in Conveyor Reengineering, Concrete and Structure Design as well as detailed Structural. For the Expansion Project of the Santa Elena Mine

Nusantara de México S.A. de C.V.

Start date: 2014

Banamichi
Sonora

Collaboration in development of Isometric Engineering for Construction of Pipes and Supervision in workshops Structures Manufacturing Santa Elena mine.

Nusantara de México S.A. de C.V.

Start date: 2014

Banamichi
Sonora

Supervision in construction of structural and pipe work for the Expansion Project of the Santa Elena Mine.

Nusantara de México S.A. de C.V.

Start date: 2013

Banamichi
Sonora

Supervision of the Construction of Structural and Piping works for the Expansion Program of  the Santa Elena Mine. 

Nusantara de México S.A. de C.V.

Start date: 2013

Banamichi
Sonora

Conveyor Re-engineering, Concrete and Structural Design, also Structural  Detailing for the Expansion Program of the Santa Elena Mine.

Nusantara de México S.A. de C.V.

Start date: 2013

Banamichi
Sonora

Isometric Engineering for Piping Construction and Supervision of Structural Manufacturing  workshops for the Expansion Program of the Santa Elena Mine.

Minera Meridian S. de R.L. de C.V.

Start date: 2013

Magdalena
Sonora

Automation of Underground Ventilation Fans

Endeavour Silver

Start date: 2013

Guanaceví
Durango

Supervision of Works for the Tailings Dam of a Refinery. Guanavecí Plant.

Endeavour Silver

Start date: 2013

Guanajuato
Guanajuato

Joint work with Smith Foster & Assoc. in the process expansion from 800 TPD to 1200 TPD. El Tajo Project.

Endeavour Silver

Start date: 2012

Guanajuato
Guanajuato

Joint work with Smith Foster & Assoc. in the process expansion from  1400 TPD to 1600 TPD. Bolañitos

Cobre del Mayo S.A. de C.V.

Start date: 2011

Alamos
Sonora

Supervision of Conveyor Manufacturing in the city of San Luis Potosí. Piedras Verdes Mine.

Endeavour Silver

Start date: 2010

Guanaceví
Durango

Joint work with Axxent Engineer LDT in the process expansion from 800 TPD to 1200 TPD.